SMART Tunnel reopens

Traffic in the city, traffic cam, stretch under construction, road closure, usual jam area and jam hours, highway under construction, obstruction, floods, landslide and etc

SMART Tunnel reopens

Postby admin » Wed May 25, 2011 4:25 am

KUALA LUMPUR: The SMART Highway has been fully reopened to motorists from 6am Wednesday after a temporary closure for flood system operations.

The highway was closed to traffic since 6.11pm on Saturday following an instruction from the Drainage and Irrigation Department to divert excessive river water from the Sungai Klang and Sungai Ampang into the highway's flood operations system.

The move had spared the capital city of major flooding despite the heavy downpour.

Read the full article:
http://thestar.com.my/news/story.asp?fi ... sec=nation
admin
Informer
 
Posts: 3811
Joined: Thu Jan 01, 1970 12:00 am
Location: Kuala Lumpur

Return to Congestion, Traffic Jams & Road Closure

Who is online

Users browsing this forum: No registered users and 0 guests

  • Lazada Malaysia Lazada Malaysia Lazada Malaysia Lazada Malaysia
cron